Operational Infrastructure for Delivery at Scale
Win the customer contract.
Then actually deliver on it.
Jer-nee builds the operational infrastructure physical and digital product manufacturers need to execute at scale, connecting your systems, processes, and teams so growth does not outrun your ability to deliver.
Financial and Operational Impact
$5.9M Financial Savings
Enabled across software development, aerospace, defense, and high-tech manufacturers.
$27.2M Operational Value
Hard operational value is unlocked for our customers.
$8.4M Margin Capacity
Additional margin capacity is generated.
Speed to Value & Quality
8 Weeks (Avg.) Arena Live Deployment
Getting your team operational in PLM environments rapidly.
7 Weeks (Avg.) Legacy Ticketing Replacement
Seamless migration from outdated systems with minimal downtime.
12 Weeks (Avg.) Atlassian Multi-Product Implementation
Concurrent deployment and integration of five Atlassian products.
100% First Attempt AS9100/ISO9001 Certification
Achieving aerospace and manufacturing quality management standards on the very first try.
WHO WE ARE
Jer-nee is an operational execution partner that builds operational infrastructure for aerospace, defense, UAS, hardware electronics, manufacturing, and government services companies between 50 and 2,500 employees. Jer-nee connects the quality system, the product record, the work system, and the floor so a change lands everywhere it needs to land. Engagements start with a 6-week Operational Readiness Assessment and run 3 to 18 months.
WHO WE HELP
Built for organizations where execution cannot fail.
You built a product, tangible or digital, with contracts to deliver and certifications to hit. Growth is outpacing the systems built to handle it. If that is familiar, you are in the right place.
Advanced Manufacturing
Multi-site, multi-system operations after acquisition or a roll-up.
​
Hardware & Electronics
BOM accuracy, revision control, and shortage visibility at the kit level, with firmware and hardware changes that stay in step.
​
Aerospace & Defense
Contract delivery under AS9100D, with configuration management a customer will audit.
Technology & Software
Firmware ships alongside hardware, a Jira site that grew instead of being designed, and leadership asking what is on track and getting a meeting instead of an answer.
THE PROBLEM
Rapid growth often exposes problem areas.
As organizations grow, disconnected systems and inconsistent processes become expensive.
Disconnected teams and systems
Departments work from different platforms, spreadsheets, and sources of truth.
Manual work and bottlenecks
Approvals, changes, reporting, and handoffs depend on email and individual employees.
Processes that do not scale
What worked at 20 employees or 10 products becomes unmanageable as volume increases.
Quality and compliance gaps
Processes exist on paper without being built into day-to-day operations.
​
Poor operational visibility
Leadership cannot see what is actually happening across teams, products, and systems.
Technology without adoption
Organizations invest in tools but never connect them to the way people actually work.
None of this is a tooling problem.
It is an operating model problem.
DECISIONS THAT LOOK LIKE PROGRESS
Three ways this gets more expensive.
01
Buying the platform before defining the process
A new PLM on top of an undefined change process gives you the same problem, faster, with a renewal attached.
02
Certifying on paper instead of on the floor
The binder passes. The floor runs differently. The auditor finds the gap between them, and so does
03
Hiring one more person to hold it together
An internal hire is the most common alternative to fixing the operating model. It is also the one where the knowledge leaves when they do.
THE GAP, CLOSED
Operational debt. Settled.
Results from a 10-month engagement with a Blue UAS certified defense manufacturer.
BEFORE | AFTER |
|---|---|
Certification: unclear timelines | AS9100D certified, first attempt, from an ISO 9001 baseline |
Change orders: 10-day average cycle | 5-day average cycle, cut 50% |
Inventory discrepancy: unreliable counts | Improved 75 to 85% |
Audit readiness: reactive, weeks to assemble | Current and continuous |
Adoption: fragmented, tool by tool | 98% ERP adoption through role-based work instructions |
Platforms: disconnected tools | One connected system of record |
"Jer-nee played a key role in helping us meet the milestones required to secure a $50M DoD contract award."
- George Matus, President, Teal Drones
HOW WE WORK
A framework for the operating model, and a method for getting there.
THE JER-NEE FRAMEWORK
Six elements that keep strategy connected to execution: Joined Strategy, Execution Engine, Responsibility, Navigational Metrics, Enterprise Systems, Enterprise Resilience.
​
Five operating domains run inside Enterprise Systems: System of Work, Product Lifecycle, Quality Management, Supply Chain, Technology Infrastructure.
SOAR: HOW WE DELIVER
Strategic Operations Aligned and Reinforced. Four phases- 01 Assess, 02 Prioritize, 03 Design, 04 Implement and Sustain, take you from diagnosis to a working operating model rather than a slide deck.
​
Engagements run 3 to 18 months.
​
​
Atlassian implementation can be purchased from many companies. The methodology for transforming the organization around that technology is proprietary to Jer-nee. We do not stop at recommendations. We stay through execution.
PLATFORMS
Technology that supports the way you operate.
Atlassian Gold Solution Partner
Atlassian
SOLUTIONS
How we support your organization.
Operational Readiness Assessment
Six weeks, on site. A Findings Report and a Sequenced Roadmap you keep unconditionally.
​
Document Control
DoD documentation and configuration management readiness. Controlled release, not a shared drive.
Change Management & Adoption
Role-based enablement that gets people using the systems, not just installing them.
Quality
Management
AS9100D and ISO 9001 readiness. Document control, configuration management, EIA-649 part numbering, audit readiness.
System of Work
Jira, Jira Service Management, and Confluence implementation, with service queues and SLAs that hold.
Product Lifecycle & Change Control
PLM implementation and migration. BOM management, ECO process, revision control.
​
Supply Chain Operations
Inventory accuracy, material planning, and shortage visibility at BOM and kit level.
CUSTOMER RESULTS
Real transformation. Measurable results.
We report Delivered, Reconciled, and Enabled value separately, because they behave differently. How we measure.
COMMON QUESTIONS
Questions buyers ask before the first call.
What does an Operational Readiness Assessment include?
Two weeks, on site, fixed fee. Executive interviews, systems inventory, handoff mapping, and baseline measurement per function. You keep a Findings Report and a Sequenced Roadmap whether or not the engagement continues.
How long does AS9100D readiness take from an ISO 9001 baseline?
One Blue UAS manufacturer certified on the first attempt inside a 10-month engagement, with the quality management foundation built in the first 6 weeks and DoD documentation over the following 8.
Does Jer-nee deliver CMMC or NIST 800-171 compliance?
No. Jer-nee does not deliver CMMC, NIST 800-171, ITAR, EAR, FedRAMP, or cybersecurity compliance of any kind. DoD documentation and configuration management readiness, EIA-649 part numbering, Arena Government Cloud, and AS9100D readiness are in scope. We will refer you for the rest.
How is this different from hiring someone internally?
An internal hire is the most common alternative. The difference is speed and what remains: the operating model, the documented process, and the configured systems stay with the company rather than leaving with a person.
.png)